Structure
:
RCC framed structure on pile foundation. Internal & external walls with red bricks and Aluminium composite panel, glazing glass wherever needed.
Floor
:
Elegant Granite flooring for common area.
Vitrified flooring for shop area.
Toilets will have non glazed / antiskid ceramic flooring.
Painting Finishes
:
All interior walls will be coated with two coat of putty, finished with premium emulsion paint.
Air Conditioning - Centralised
:
Electricals
:
Three phase power supply with concealed wiring (Finolex/equivalent) in PVC conduits controlled by ELCB and MCB, through independent energy meters for each shop.
Modular switches of LEGRAND/ABB or equivalent will be provided.
Announcement system in common area.
Power Backup
:
For Lift, water pumps, common lights adequate points for each shop.
Internet/ Telephone/Intercom
:
Adequate Internet/Telephone points and intercom will be provided for each
shops at suitable location
Toilets
:
All toilets will be provided with cascade EWC
Toilet will have elegant designer ceramic wall tile up to ceiling
Water
:
Adequate water will be provided.
Fire Fighting
:
Will provide as per government safety norms.
Car Parking
:
Base car parking for owners at extra cost and visitors parking in ground.
Lifts
:
Two fully automatic high speed passenger lifts of Schindler.